INDOOROOPILLY STATE HIGH SCHOOL
TUCKSHOP

Following our refurbishment of Indooroopilly State High School’s Administration Building and School Hall, C W Chandler has recently designed and managed the relocation and development of the school’s new Tuck Shop.

IMG_6066.jpg

PROJECT INFO

Project Timeline
Completed 2021

Project Size
250 sqm

Project Value
$1.8m

Contractor
Chapcon Design & Construct
Naric Civil

Program
High Turnover Commercial Kitchen, Food Storage & Loading, Shopfront, Student Verandah & Access, Landscape Upgrade to ‘Town Square’

IMG_6020.jpg

The school’s tuck shop was relocated into a new building set on the edge of ‘Town Square’, providing students and staff with a centrally located, easily accessible ‘food’ destination. 

INDOOROO IMG_20210419_165449.jpg
IMG_6568.jpg

The brief called for a modular, relocatable building which set criteria for reassignment to another location should the need arise. Being fully ‘PWD’ accessible, the new building features a covered eating area which visually connects to the greater ‘Town Square’ precinct with its undercover shade areas.

IMG_6575.jpg
IMG_5930.jpg

The facility is designed for high throughput within short periods and opens each school day providing hot and cold food types. The new amenities represent a ‘quantum’ upgrade to what was previously available and appears popular to students and staff alike. 

IMG_5928.jpg
IMG_5931.jpg

This project was delivered within budget and to a strict timeframe, including excavation of the hillside to create the site for the building without disruption to school activities.